September 10th News: Notice on the Public Solicitation of Comments on the National Standard “Appearance Quality Requirements and Dimensional

Because WeChat has changed its push rules, tweets are no longer displayed according to the timeline.

If you don’t click ‘watching’ or don’t have a ‘star icon’, you may not be able to see our push! If you don’t want to miss out on the exciting news of “Precast Building Network” every noon, please remember to “set us as a star”.

Lifting Socket

.

Five Steps to Build an Industry Leading Intelligent Factory for Concrete Precast Components

In the wave of transformation and upgrading in the construction industry, intelligent factories for precast concrete components have become a new benchmark for industry development.

How to start from scratch and build a benchmark factory that integrates efficiency, intelligence, and green? Five step critical path to help you seize the opportunity.

Lifting Anchor

.

Technical expertise | Analysis of quality issues with precast stairs

Abstract: In recent years, with the strong promotion of national policies, the enthusiasm of relevant enterprises in China to participate in precast construction has been increasing, and the industry scale has been expanding year by year.

The management, quality control, acceptance, and safety management of precast construction are constantly improving, ensuring the quality of engineering and the safety of construction.

Stairs, as a type of precast concrete component, are currently widely used in precast construction in China.

Swift Lift Foot Anchor

In order to continuously improve the product quality of enterprises and reduce the occurrence of quality problems in engineering construction, this article mainly explains some common quality prevention and treatment methods for precast stairs in the production process.

.

When will the formwork be removed for concrete components?

After the concrete structure is poured and reaches a certain strength, the formwork can be removed.

Elephant Foot Ferrule

The construction site mainly determines when the formwork can be removed based on the strength of concrete test blocks cured under the same conditions, and the specific formwork removal date should be determined according to the structural characteristics and the strength achieved by the concrete.

.