Technology for breaking the pile head of concrete cast-in-place pile by ring cutting method

The Ministry of Housing and Urban Rural Development has issued clear regulations: for building construction projects with a foundation design grade of Class B or above, the direct chiseling method shall not be used for the pile head of the cast-in-place pile.

Coil Loop Insert

It is recommended to use two alternative processes: “pre cutting method+mechanical chiseling” and “ring cutting method”.

The ring cutting method is currently the most widely used pile head breaking method due to its flexible operation and controllable quality.

.

Leave a Comment