Construction of Shiziyang Bridge: Temperature Field and Deformation Analysis of Ultra High Cable Tower Construction

The research adopts a process of temperature calculation, structural analysis, and on-site verification, using the full-scale test model of the cable tower structure as the structural object for analysis, monitoring, and verification.

Concrete Plate Anchors

The main research work includes:.

Leave a Comment