Watch the news first.
From September 9th to 15th, the concrete transportation volume of 506 mixing plants was 1.
3555 million cubic meters, an increase of 5.
19% compared to the previous period.
The capacity utilization rate was 6.
77%, an increase of 0.
34 percentage points compared to the previous period.
This is the second consecutive week of recovery after a 7.
30% increase in the previous week, and the construction site is indeed rushing to meet the schedule after the weather improves.
.