This plan is applicable to existing concrete renovation projects that have been confirmed by design to use planted reinforcement connections.
Planting steel bars is just a construction action, and whether it can be used for adding connections still requires design basis.
This plan is aimed at determining the construction scope through structural investigation, connection design, and material suitability for the existing concrete reinforcement connection confirmed by the design.
The hole position, anchoring, and subsequent loading conditions shall be subject to the requirements of this project, and the ability to drill steel bars on site shall not be used as the basis for the connection to undertake the design function.
The implementation content should be separated from adjacent projects, and the design parameters, materials, and processes should be based on the effective documents of this project.
When there are changes in on-site conditions, the impact should be verified first, and adjustments should have a confirmed basis, rather than relying solely on verbal opinions for construction.
.