It is crucial to develop specialized mix proportion adjustment plans and production precautions for concrete construction in autumn and winter, especially under low temperature, strong wind, and dry conditions.
This can effectively prevent a series of problems such as concrete freezing damage, slow strength growth, cracking, etc.
, ensuring the quality and progress of the project.
.