The efficient concrete conveying and pouring system developed by Beijing Construction Machinery Institute has been successfully applied in

Beijing Construction Mechanization Research Institute Co.

Swift Lift Void Former

, Ltd.

aims to meet the urgent needs of large-scale infrastructure construction such as water conservancy and hydropower, wind power, highways and railways, bridge and tunnel engineering, and has developed a high-efficiency concrete conveying and pouring system.

It has successfully achieved a large number of engineering applications and has been applied in batches to many national key engineering projects such as the Century Engineering Pinglu Canal, and exported to international projects such as the Kekai Hydropower Station in Angola.

.

Leave a Comment