During construction, the retention of concrete test blocks is divided into standard curing test blocks and test blocks under the same conditions.
The reason why the testing of concrete test blocks requires both standard curing and the same conditions is that the two represent different meanings and play different roles, and cannot be simply or mutually denied.
Both must be qualified.
.