Precautions for winter construction of permeable concrete

According to the industry standard “Construction Code for Building Engineering” JGJ104-97 in China, the construction process where the daily average outdoor temperature remains below 5 ° C for 5 consecutive days is called winter construction.

When the project enters the winter construction stage, corresponding winter construction measures should be taken for concrete pavement engineering.