When pouring concrete into the mold, it is not allowed to pour and impact the formwork or steel reinforcement skeleton in a concentrated manner.
When the pouring height is greater than 2 meters, a string tube or chute should be used for feeding.
The free height of the pouring from the discharge pipe mouth to the pouring layer should not exceed 1.
5 meters.
.