Complete guide for winter concrete construction!

According to JGJ/T104-2011 “Winter Construction Regulations for Building Engineering”, winter construction begins when the daily average outdoor temperature remains below 5 ℃ for five consecutive days.

Erection Anchor

Concrete structure engineering should adopt winter construction measures and take anti freezing measures for sudden temperature drops.

.

Leave a Comment