Characteristics and frost damage of winter construction in concrete engineering

In addition to the specific provisions of the regulations, the winter construction period is divided into three stages to facilitate the management of concrete engineering construction from November 15th to March 15th each year.

Dog Bone Anchor

Different technical adjustment plans are formulated according to different temperatures.

.

Leave a Comment