How to pour concrete with a difference of one grade?

When the concrete strength of columns and walls is two or more grades higher than that of beams and slabs during the construction process, separation measures should be taken in the boundary area.

Both the construction and supervision units recognize this situation, and the construction unit generally takes the following measures to intercept it.

Halfen Channel

.

Leave a Comment