The excavation section of the trench should comply with the requirements of the construction organization design (plan).
The undisturbed foundation soil at the bottom of the trench shall not be disturbed.
During mechanical excavation, a 200-300mm soil layer shall be reserved at the bottom of the trench for manual excavation to the design elevation and leveling;.