Technical expertise | Analysis of quality issues with precast stairs

Abstract: In recent years, with the strong promotion of national policies, the enthusiasm of relevant enterprises in China to participate in precast construction has been increasing, and the industry scale has been expanding year by year.

The management, quality control, acceptance, and safety management of precast construction are constantly improving, ensuring the quality of engineering and the safety of construction.

Stairs, as a type of precast concrete component, are currently widely used in precast construction in China.

Swift Lift Foot Anchor

In order to continuously improve the product quality of enterprises and reduce the occurrence of quality problems in engineering construction, this article mainly explains some common quality prevention and treatment methods for precast stairs in the production process.

.

When will the formwork be removed for concrete components?

After the concrete structure is poured and reaches a certain strength, the formwork can be removed.

Elephant Foot Ferrule

The construction site mainly determines when the formwork can be removed based on the strength of concrete test blocks cured under the same conditions, and the specific formwork removal date should be determined according to the structural characteristics and the strength achieved by the concrete.

.