XX Building Construction Project ‘Concrete Construction Plan’

The project is located in Xizang.

The first phase of the project includes XX International Hotel, supporting boiler room, power distribution room, etc.

Pfeifer VS Box

, with a total construction area of 20800 ㎡.

The bottom of the foundation pit is designed to be about 2.

2m lower than the outdoor ground, and the foundation form adopts a combination of independent foundation and strip foundation.

.

Leave a Comment