Hangzhou Metro Line 15, Section 4, Gold to Construction, Double Line Connection

Recently, as the cutterhead of the No.

Ferrule Loop Insert

625 shield machine of China Railway Equipment slowly broke through the wall, the left line of the section from Jinjilu Station to Jianshe Yilu West Station of Hangzhou Metro Line 15, which was constructed by China Railway First Bureau, was accurately connected, and thus the double track tunnel of this section was successfully connected.

.

Leave a Comment