Preparation Notes | Core Exam Points for Concrete Dam Engineering in First Construction Water Conservancy Practice

(1) Before installing the concrete pump and delivery pipe, the dirt and cement mortar inside the pipe should be thoroughly removed, and washed clean with pressure water.

Rebar Saddles

Check in a timely manner after installation to prevent detachment and leakage of grout.

.

Leave a Comment