The ground of the industrial plant is made of wear-resistant concrete, and the surface layer is made of 160mm thick C30 reinforced concrete cast-in-place and wear-resistant epoxy self leveling layer.
Adopting the seamless construction technology of short distance stress release, that is, setting construction joints in the vertical direction on the concrete ground, dividing the ground into several blocks of a certain size with construction joints, pouring adjacent blocks at intervals (jumping pouring), and after the concrete is poured first and undergoes significant shrinkage deformation, it is connected and poured into a whole.
This seamless construction technology for short distance stress release is based on the non-linear relationship between temperature shrinkage stress and structural length, utilizing the large early temperature and shrinkage deformation of concrete.
The method of releasing stress in a short distance is adopted to cope with early large shrinkage.
Concrete Lifting Clutch
After the concrete passes the early large temperature and shrinkage, each block is poured and connected as a whole to cope with smaller shrinkage.
.